Request for license for public lighting service no. 20*

Request for license for the public lighting service, provided under the delegated management method by specialized providers established as commercial companies - https://www.anrsc.ro/gestiune-delegata-iluminat-public/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and in if necessary, the regulatory authority sends the applicant an address by which they are informed of the obligation to make additions, corrections, or clarifications, regarding the application and the submitted documents, within 30 days from the registration of the documentation.

If within 30 days from the date of the request for additions, the applicant does not provide all the correct documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, removing the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the documentation provided; b) to verify, on the spot, the reality of the data from the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report that includes the substantiated proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is submitted to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In the case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice for the licensing fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After confirming the payment, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. for the granting of the license, accompanied by the license and its associated conditions.

In case the 30-day deadline for payment of the licensing fee is not met, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. refusing the license, accompanied by the reasons for refusal.

In case the granting of the license is refused, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuing the order of refusal.

Final document:

a) Order for granting the license, accompanied by the license and the conditions associated with the license;

b) Order for rejection of the license, accompanied by the reasons for the refusal to grant;

c) Notification regarding removal of the application from the procedure.

Notification period upon expiration of the resolution period: 5 days from the date of confirmation of payment of the licensing fee, in case of granting the license, or 5 days from the date of issuance of the order of rejection of the license.

Additional information https://www.anrsc.ro/front-page-iluminat-public/

*
PROCEDURA
Companii
National

Request for license for public sewer service no. 12*

Request for license for public sewerage service, provided under the delegated management method by specialized providers established as commercial companies-https://www.anrsc.ro/gestiune-delegata-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by the A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections, or clarifications, regarding the application and submitted documents, within 30 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation stipulated by the regulation, including the requested additions, A.N.R.S.C. will return the respective documentation, deleting the application from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of submission and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects arising/not arising from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a report which includes the well-founded proposal for granting/rejecting the license and which will be submitted for analysis to the Licensing Commission, by the commission secretary.

The proposal to grant/reject the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is made by order of the A.N.R.S.C. president.

In case of granting the license, A.N.R.S.C. communicates to the applicant the tax invoice for the license fee, which must be paid no later than 30 days from the date of communication of the invoice.

After payment confirmation A.N.R.S.C. sends to the applicant within a maximum of 5 days, the order of the A.N.R.S.C. president granting the license accompanied by the license and the associated conditions.

If the 30-day deadline for payment of the license granting fee is not met, A.N.R.S.C. will proceed to revoke the license.

In case of refusal to grant the license, A.N.R.S.C. sends to the applicant within a maximum of 5 days from issue, the order of the A.N.R.S.C. president refusing the license accompanied by the reasons for refusal.

In the case where the granting of the license was refused, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the refusal order.

Final document:

a) Order granting the license, accompanied by the license and the conditions associated with the license;

b) Order refusing the license, accompanied by the reasons for the refusal;

c) Notification regarding the cancellation of the application from the procedure.

Notification deadline upon expiry of the resolution period: 5 days from the date of confirmation of payment of the license granting fee, in case of granting the license, or 5 days from the date of issue of the order refusing the license.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for public water supply service no. 06*

Request for license for the public water supply service, provided under delegated management by commercial companies with entirely public capital - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the completions requested by A.N.R.S.C.

Procedure description : The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications, regarding the request and the documents submitted, within 30 days from the registration of the documentation.

If , within 30 days from the date of the request for additions, the applicant does not provide all the required documentation stipulated by the regulation, including the requested additions, A.N.R.S.C. will return to the applicant the related documentation, deleting the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant to clarify certain aspects that result/do not result from the provided documentation;

b) on-site verification of the accuracy of the data from the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, drafts a specialized report that includes the justified proposal for granting/rejection of the license and this will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for granting/rejection of the license is subject to a vote by the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. informs the applicant of the invoice regarding the licensing fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After confirmation of payment, A.N.R.S.C. sends the applicant, within maximum 5 days, the order of the president of A.N.R.S.C. for granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day deadline for paying the licensing fee, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. for rejection of the license, accompanied by the reasons for refusal.

In the situation where the granting of the license was rejected, the applicant may not submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order of granting the license, accompanied by the license and its associated conditions;

b) Order of rejection of the license, together with the reasons for refusal;

c) Notification regarding the deletion of the application from the procedure.

Deadline for Notification upon the expiration of the resolution deadline: 5 days from the date of confirmation of the license granting fee payment, in case of granting, or 5 days from the date of issuing the rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for the public water supply and sewage service no. 01*

License request for the public water supply and sewerage service, provided/supplied in the modality of direct management by public services of local or county interest, with legal personality, established and organized by decisions of deliberative authorities of administrative-territorial units -
https://www.anrsc.ro/gestiune-directa-apa-canal/

Resolution time: 60 days from the registration of documentation or 30 days from the transmission by the public utility service operator of the supplements requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in the event that it is necessary, the regulatory authority sends the applicant an address informing them of the obligation to make supplements, corrections or clarifications, referring to the application and the documents submitted, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the supplement request address, the applicant does not provide all the corresponding documentation required by the regulation, including the requested supplements, A.N.R.S.C. will return the related documentation, removing the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the reality of the data contained in the documentation transmitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialty report that includes the justified proposal to grant/reject the license and which will be presented for analysis to the Licensing Commission by the commission secretary.

The proposal to grant/reject the license is put to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In case of license granting, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the invoice communication date.

After payment confirmation, A.N.R.S.C. sends the applicant within a maximum of 5 days, the A.N.R.S.C. president's order granting the license, accompanied by the license and associated conditions.

In case of failure to pay the license granting fee within the 30-day deadline, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance the A.N.R.S.C. president's order rejecting the license accompanied by the reasons for refusal.

In the situation where the license granting has been rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of the rejection order issuance.

Final document:

a) Order granting the license, accompanied by the license and the conditions associated with the license;

b) Order rejecting the license, accompanied by the reasons for refusal;

c) Notification regarding the removal of the application from the procedure.

Notification deadline upon the expiration of the resolution term: 5 days from the date of confirmation of payment of the license granting fee, in case of license granting, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for public lighting service no. 17*

License request for the public lighting service, provided in the manner of direct management by local or county public services, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units -
https://www.anrsc.ro/gestiune-directa-iluminat-public/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and in the event that it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications, regarding the request and the submitted documents, within 30 days from the registration of the documentation.

In case within 30 days from the date of the request letter for additions, the applicant does not provide all the required documentation stipulated by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, canceling the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the available documentation;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, drafts a technical report that includes the motivated proposal for granting/rejecting the license and which will be submitted for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is submitted to a vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C.

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After payment confirmation, A.N.R.S.C. will send to the applicant within maximum 5 days, the order of the president of A.N.R.S.C. granting the license accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day deadline for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. will send to the applicant, within maximum 5 days from issuance, the order of the president of A.N.R.S.C. refusing the license accompanied by the reasons for refusing to grant it.

In the case where granting the license has been refused, the applicant may not submit a new licensing documentation sooner than 6 months from the date of issuance of the refusal order.

Final document:

a) Order granting the license, accompanied by the license and the associated license conditions;

b) Order refusing the license, accompanied by the reasons for refusal;

c) Notification regarding the cancellation of the request from the procedure.

Notification deadline upon expiration of the processing term: 5 days from the date of payment confirmation of the license granting fee, in the case of license granting, or 5 days from the date of issuance of the license refusal order.

Additional information https://www.anrsc.ro/front-page-iluminat-public/

*
PROCEDURA
Companii
National

Modification of the conditions associated with the license in the case of termination of certain management delegation contracts no. 01*

The documents submitted by the applicant for the purpose of amending the license or amending the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications, referring to the application and the submitted documents, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the relevant documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, removing the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the documentation provided;

b) verifying, on site, the reality of the data in the documentation submitted by the applicant.

A.N.R.S.C., through its specialized department, prepares a specialized report which includes the justified proposal for amending the license or the conditions associated with the license and which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal for amending the license or the conditions associated with the license is subject to a vote by the Licensing Commission.

Notification Deadline at the expiration of the resolution period: 5 days from the date of issuance of the order by the President of A.N.R.S.C..

*
PROCEDURA
Companii
National

Modification of the conditions associated with the license in the case of awarding other management delegation contracts no. 03*

Resolution time: 30 days from the registration of the documentation or 30 days from the submission by the public utilities service operator of the completions requested by A.N.R.S.C.

The documents submitted by the applicant for the modification of the license or the modification of the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a notification informing them of the obligation to provide additions, corrections, or clarifications regarding the application and the submitted documents, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the relevant documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, striking out the respective request from the licensing procedure, and communicating this decision to the applicant.

Depending on the manner of submission and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the documentation made available; b) to verify, on site, the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a report that includes the justified proposal for the modification of the license or the conditions associated with the license, which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal to modify the license or the conditions associated with the license is submitted to a vote within the Licensing Commission.

Notification term at the expiration of the resolution term: 5 days from the date of issuance of the order by the president of A.N.R.S.C..

*
PROCEDURA
Companii
National

Withdrawal of the license in case of expiration or termination of the contract/contracts for delegation of management or the revocation of the administration decision no. 01*

Resolution time: 15 days from the registration of the documentation or 15 days from the transmission by the public utilities services operator of the completions requested by A.N.R.S.C.

The documents submitted by the applicant for the withdrawal of the license or the withdrawal of the permission to provide/supply the service/activity in an administrative-territorial unit are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make completions, corrections, or clarifications, with reference to the application and the documents submitted, within 5 days from the registration of the documen

If, within 30 days from the date of the request letter for completions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested completions, A.N.R.S.C. will return to the applicant the related documentation, removing the respective request from the procedure for withdrawal of the license or withdrawal of the permission to provide/supply the service/activity in an administrative-territorial unit, communicating this decision to the applicant.

Depending on the manner of submission and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the documentation made available; b) to verify, on site, the reality of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report that includes the justified proposal for the withdrawal of the license or withdrawal of the permission to provide/supply the service/activity in an administrative-territorial unit and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for withdrawal of the license or withdrawal of the permission to provide/supply the service/activity in an administrative-territorial unit is put to the vote within the Licensing Commission.

in an administrative-territorial unit is done by order of the president of A.N.R.S.C., which will be sent to the license holder within a maximum of 5 days from the date of issuance.

Notification period upon expiration of the resolution time: 5 days from the date of issuance of the president of A.N.R.S.C. order.

*
PROCEDURA
Companii
National

Amendment of the license following the extension of the validity period of the management delegation contract no. 02*

Resolution time: 30 days from the registration of the documentation or 30 days from the submission by the public utilities service operator of the completions requested by A.N.R.S.C.

The documents submitted by the applicant for the amendment of the license or the modification of the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications, with reference to the request and the documents submitted, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested completions, A.N.R.S.C. will return the related documentation and remove the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant to clarify certain aspects arising/not arising from the documentation provided; b) to verify, on site, the accuracy of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report which includes the justified proposal for amending the license or the conditions associated with the license, which will be submitted for analysis to the Licensing Commission by the secretary of the commission.

The proposal to amend the license or the conditions associated with the license is submitted to a vote within the Licensing Commission.

Notification period upon expiration of the resolution term: 5 days from the issuance of the order by the president of A.N.R.S.C.

*
PROCEDURA
Companii
National

Modification of the license in case of changes to the identification data of the license holder no. 01*

Resolution time: 30 days from the registration of the documentation or 30 days from the submission by the public utilities service operator of the additions requested by A.N.R.S.C.

The documents submitted by the applicant for the modification of the license or the modification of the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a notice informing them of the obligation to provide additions, corrections or clarifications, regarding the application and documents submitted, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, removing the respective application from the licensing procedure, notifying the applicant of this decision.

Depending on the manner of submission and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the submitted documentation; b) to check, on site, the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a report which includes the justified proposal for the modification of the license or the conditions associated with the license and which will be submitted for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for the modification of the license or conditions associated with the license is put to a vote within the Licensing Commission.

Notification period upon resolution deadline expiration: 5 days from the date of issuance of the A.N.R.S.C. president’s order.

*
PROCEDURA
Companii
National

Request for license for public sewerage service no. 10*

Request for license for the public sewerage service, provided under the delegated management method by companies with fully public capital - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities operator of the completions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and in the event that it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications, regarding the application and the submitted documents, within 30 days from the registration of the documentation.

If, within 30 days from the date of the notice requesting additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return this documentation, deleting the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the applicant's submitted documentation, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the available documentation;

b) on-site verification of the authenticity of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialty report that includes the justified proposal for granting/rejecting the license, which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal for granting/rejecting the license is put to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C.

In the case of license granting, A.N.R.S.C. notifies the applicant of the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of the invoice notification.

After payment confirmation, A.N.R.S.C. sends to the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

In case of failure to comply with the 30-day deadline for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends to the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. refusing the license, accompanied by the reasons for the refusal.

If the license granting has been refused, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) License granting order, accompanied by the license and the conditions associated with the license;

b) Order of license rejection, accompanied by the reasons for refusal;

c) Notification regarding the deletion of the request from the procedure.

Notification deadline upon expiry of the resolution deadline: 5 days from the date of payment confirmation of the license granting fee, in the case of license granting, or 5 days from the date of issuance of the order of license rejection.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Public lighting service license request no. 18*

License request for public lighting service, provided through direct management by companies with fully public capital - https://www.anrsc.ro/gestiune-directa-iluminat-public/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notification informing them of the obligation to provide additions, corrections, or clarifications, regarding the application and the submitted documents, within 30 days from the registration of the documentation.

In case, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulations, including the requested additions, A.N.R.S.C. will return the corresponding documentation and will remove the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) the summoning, at the A.N.R.S.C. headquarters, of the authorized representatives of the applicant, to clarify certain aspects arising/not arising from the provided documentation;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a report which includes the justified proposal to approve/reject the license and which will be submitted for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In the case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After confirming the payment, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day deadline for paying the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. rejecting the license, accompanied by the reasons for refusal.

In cases where the license has been denied, the applicant may not submit new licensing documentation sooner than 6 months from the date of issuance of the rejection order.

Final document:

a) Order to grant the license, accompanied by the license and the conditions associated with the license;

b) Order to reject the license, accompanied by the reasons for refusal;

c) Notification regarding the removal of the application from the procedure.

Notification deadline upon expiry of the resolution period: 5 days from the date of confirmation of payment of the license granting fee, in the case of license granting, or 5 days from the date of issuance of the license rejection order.

*
PROCEDURA
Companii
National

Request for license for public water supply service no. 07*

Request for license for the public water supply service, provided in the form of delegated management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notification informing them of the obligation to make additions, corrections or clarifications regarding the application and the submitted documents, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the respective documentation to the applicant, deleting that request from the license granting procedure, notifying the applicant of this decision.

Depending on the way of presentation and complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) the summoning, at the headquarters of A.N.R.S.C., of the applicant's authorized representatives, to clarify certain aspects that arise/do not arise from the provided documentation;

b) the on-site verification of the reality of the data from the documentation transmitted by the applicant.

A.N.R.S.C., through its specialized department, draws up a specialized report that includes the substantiated proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. communicates to the applicant the tax invoice for the license granting fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After confirmation of payment, A.N.R.S.C. sends the applicant within a maximum of 5 days, the order of the president of A.N.R.S.C. for granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day term for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from the issuance, the order of the president of A.N.R.S.C. for rejection of the license accompanied by the reasons for refusal to grant.

In the situation where the granting of the license was rejected, the applicant can no longer submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order for granting the license, accompanied by the license and the conditions associated with the license;

b) Order for rejection of the license, accompanied by the reasons for refusal to grant;

c) Notification regarding deletion of the request from the procedure.

Notification deadline upon expiry of the resolution period: 5 days from the date of confirmation of license granting fee payment, in case of license granting, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for the public sewage service no. 09*

Request for a license for the public sewerage service, provided through direct management by public services of local or county interest, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units -
https://www.anrsc.ro/gestiune-directa-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the completions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends to the applicant a letter informing them of the obligation to make additions, corrections or clarifications, with reference to the request and the documents submitted, within 30 days from the registration of the documentation.

In case, within 30 days from the date of the request letter for additions, the applicant does not provide all the appropriate documentation provided by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, deleting the respective request from the license granting procedure, informing the applicant of this decision.

Depending on the presentation method and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) calling, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialty department, draws up a specialty report which includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission, by the Secretary of the Commission.

The proposal for granting/rejecting the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the President of A.N.R.S.C.

In the case of granting the license, A.N.R.S.C. communicates to the applicant the tax invoice for the license granting fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After confirming the payment, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the President of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day term for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the President of A.N.R.S.C. rejecting the license, accompanied by the reasons for refusal.

For the situation in which the granting of the license has been refused, the applicant can no longer submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order for granting the license, accompanied by the license and the associated conditions;

b) Order for rejecting the license, accompanied by the reasons for refusal;

c) Notification regarding the removal of the request from the procedure.

Notification term upon expiration of the processing period: 5 days from the date of payment confirmation of the license granting fee, in case of granting the license, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for sanitation service no. 16*

Request for license for the public sanitation service of localities or for one or more specific activities of this service, provided through the delegated management method by specialized providers established as commercial companies - https://www.anrsc.ro/gestiune-delegata-salubrizare/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications, referring to the application and submitted documents, within 30 days from the registration of the documentation.

If , within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation stipulated by the regulation, including the required additions, A.N.R.S.C. will return the related documentation, removing the respective application from the license granting procedure, communicating this decision to the applicant.

Depending on how the information is presented and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, to clarify certain aspects that emerge/do not emerge from the submitted documentation;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through its specialized department, prepares a specialist report that includes the justified proposal for granting/rejection of the license, which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for granting/rejection of the license is submitted to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C.

In case of license granting, A.N.R.S.C. notifies the applicant of the tax invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date the invoice is communicated.

After payment confirmation, A.N.R.S.C. sends to the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. for the granting of the license, accompanied by the license and the associated conditions.

If the deadline of 30 days for payment of the license granting fee is not respected, A.N.R.S.C. will proceed to revoke the license.

In case of refusal to grant the license, A.N.R.S.C. sends to the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. of license rejection, accompanied by the reasons for refusal.

In the situation where the granting of the license has been rejected, the applicant may not submit a new licensing documentation sooner than 6 months from the date of the order of rejection.

Final document:

a) License granting order, accompanied by the license and the associated conditions of the license;

b) License rejection order, accompanied by the reasons for refusal;

c) Notification regarding the removal of the application from the procedure.

Notification deadline at the expiration of the processing period: 5 days from the confirmation of payment of the license granting fee, in case of granting the license, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-salubrizare/

*
PROCEDURA
Companii
National

License request for public lighting service no. 19*

Request for license for the public lighting service, provided in the direct management mode by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-directa-iluminat-public/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications, regarding the application and the submitted documents, within 30 days of the registration of the documentation.

In the event that, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by regulation, including the requested additions, A.N.R.S.C. will return the submitted documentation to the applicant, removing the respective application from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, to the headquarters of A.N.R.S.C., the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the documents provided;

b) verification on-site of the accuracy of the data provided in the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialist report which includes the justified proposal to grant/reject the license and which will be submitted for analysis to the Licensing Commission, by the commission secretary.

The proposal to grant/reject the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C.

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the communication of the invoice.

After confirming the payment, A.N.R.S.C. transmits to the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day deadline for paying the license granting fee, A.N.R.S.C. will proceed to revoke the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from the issuance, the order of the president of A.N.R.S.C. rejecting the license, accompanied by the reasons for refusal.

In case the license is refused, the applicant may not submit new licensing documentation sooner than 6 months from the date the order of rejection was issued.

Final document:

a) The order granting the license, accompanied by the license and the conditions associated with the license;

b) The order rejecting the license, accompanied by the reasons for refusal;

c) Notification regarding the removal of the application from the procedure.

Notification period upon expiration of the processing period: 5 days from the confirmation of payment of the license granting fee, in the case of granting the license, respectively 5 days from the date of issuance of the order rejecting the license.

Additional information https://www.anrsc.ro/front-page-iluminat-public/

*
PROCEDURA
Companii
National

Withdrawal of the permission to provide/deliver the service/activity in the administrative-territorial unit Withdrawal of the permission to provide/deliver the service/activity in the administrative-territorial unit no. 01*

Resolution time: 15 days from the registration of the documentation or 15 days from the transmission by the public utility service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the withdrawal of the license or the withdrawal of the permission to provide/supply the service/activity in an administrative-territorial unit are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications, referring to the request and the submitted documents, within 5 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the corresponding documentation to them, deleting the respective request from the procedure for withdrawal of the license or withdrawal of the permission to provide/supply the service/activityin an administrative-territorial unit, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the documentation provided; b) to verify on site the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialty report which includes the justified proposal for the withdrawal of the license or withdrawal of the permission to provide/supply the service/activityin an administrative-territorial unit and which will be submitted for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for the withdrawal of the license or withdrawal of the permission to provide/supply the service/activityin an administrative-territorial unit is put to the vote within the Licensing Commission.

The withdrawal of the license or withdrawal of the permission to provide/supply the service/activityin an administrative-territorial unit is done by order of the president of A.N.R.S.C., which will be transmitted to the license holder within a maximum of 5 days from the date of issuance.

Notification period upon expiration of the resolution period: 5 days from the date of issuance of the order by the president of A.N.R.S.C..

*
PROCEDURA
Companii
National

Modification of the conditions associated with the license in case of extending the validity period of some management delegation contracts no. 02*

Resolution time: 30 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

The documents submitted by the applicant for the modification of the license or the modification of the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a notification informing them of the obligation to make additions, corrections or clarifications, regarding the request and the submitted documents, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, deleting the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to summon, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the provided documentation;

b) to verify, on site, the accuracy of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialized report which includes the justified proposal for the modification of the license or the conditions associated with the license and which will be submitted for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to modify the license or the conditions associated with the license is put to a vote within the Licensing Commission.

Notification deadline upon expiration of the resolution period: 5 days from the date of issuance of the order of the president of A.N.R.S.C..

*
PROCEDURA
Companii
National

License request for sanitation service no. 13*

Request for license for the public sanitation service of localities or for one or more specific activities of this service, provided under the form of direct management by public services of local or county interest, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units - https://www.anrsc.ro/gestiune-directa-salubrizare/

Processing time: 60 days from the registration of the documentation or 30 days from the submission by the public utility services operator of the requested completions by A.N.R.S.C.

Procedure description: The documents submitted by the applicant in order to be granted a license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing about the obligation to make additions, corrections, or clarifications regarding the application and the documents submitted, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the notice requesting additions, the applicant does not provide all the necessary documentation as required by the regulation, including the requested additions, A.N.R.S.C. will return the relevant documentation, deleting the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the documentation provided;

b) perform on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialty report that includes the justified proposal to grant/reject the license, which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is put to the vote in the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In the case of granting the license, A.N.R.S.C. communicates to the applicant the invoice for the license granting fee, which must be paid within maximum 30 days from the date of invoice communication.

After payment confirmation, A.N.R.S.C. sends the applicant, within maximum 5 days, the order of the A.N.R.S.C. president for granting the license, accompanied by the license and the associated conditions.

In case of non-compliance with the 30 days deadline for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within maximum 5 days from issuance, the order of the A.N.R.S.C. president for rejection of the license, accompanied by the reasons for refusing the granting.

In the situation where the granting of the license has been rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order for granting the license, accompanied by the license and the associated license conditions;

b) Order for rejection of the license, accompanied by the reasons for refusal of granting;

c) Notice regarding the removal of the application from the procedure.

Notification deadline upon the expiration of the resolution term: 5 days from the date of confirmation of payment of the license granting fee, in the case of granting the license, respectively 5 days from the date of the issuance of the order rejecting the license.

Additional information: https://www.anrsc.ro/front-page-salubrizare/

*
PROCEDURA
Companii
National

Request for license for the public water supply and sewerage service no. 02*

Request for a license for the public water supply and sewerage service, provided in the form of direct management by companies with 100% public capital - https://www.anrsc.ro/gestiune-directa-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the submission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description : The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications, regarding the application and the submitted documents, within 30 days from the registration of the documentation.

If, within 30 days from the date of the request for additional documents, the applicant does not provide all the appropriate documentation required by the regulations, including the requested additions, A.N.R.S.C. will return to the applicant the corresponding documentation, canceling the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the presentation and complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the provided documentation;

b) to verify, on site, the accuracy of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report which includes the justified proposal for granting/rejection of the license, which will be presented for analysis to the Licensing Commission, by the commission’s secretary.

The proposal for granting/rejection of the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is done by the order of the A.N.R.S.C. president.

In case of granting the license, A.N.R.S.C. communicates to the applicant the invoice for the granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After the payment confirmation, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the A.N.R.S.C. president granting the license along with the license and its associated conditions.

If the 30-day deadline for paying the license granting fee is not met, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the A.N.R.S.C. president rejecting the license accompanied by the reasons for the refusal.

If the granting of the license has been rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date the rejection order was issued.

Final document:

a) Order of granting the license, accompanied by the license and the license’s associated conditions;

b) Order of rejection of the license, accompanied by the reasons for the refusal to grant;

c) Notification regarding the cancellation of the application from the procedure.

Notification deadline after the processing deadline: 5 days from the date of payment confirmation of the license granting fee, in the case of granting the license, or 5 days from the date of issuance of the order rejecting the license.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Application for license for the public water supply and sewerage service no. 03*

Request for license for the public water supply and sewerage service, provided through direct management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-directa-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the requested additions by A.N.R.S.C.

Procedure description0: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections, or clarifications regarding the request and submitted documents, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the request for additions, the applicant does not provide all the relevant documentation required by the regulations, including the requested additions, A.N.R.S.C. will return the related documentation, deleting the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant to clarify certain aspects that are/are not reflected in the provided documentation;

b) verification, on site, of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialized report which includes the justified proposal to grant/reject the license and which will be submitted for analysis to the Licensing Commission by the commission secretary.

The proposal to grant/reject the license is put to a vote within the Licensing Commission.

The granting/rejection of the license is made by order of the A.N.R.S.C. president.

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice for the license granting fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After payment confirmation, A.N.R.S.C. sends the applicant within a maximum of 5 days, the order of the A.N.R.S.C. president granting the license together with the license and its associated conditions.

In case the 30-day deadline for payment of the license granting fee is not respected, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance, the order of the A.N.R.S.C. president rejecting the license together with the reasons for refusal.

In situations where the granting of the license has been rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order granting the license, together with the license and the conditions associated with the license;

b) Order rejecting the license, together with the reasons for refusal;

c) Notice regarding the deletion of the request from the procedure.

Notification deadline at the expiration of the resolution time: 5 days from the date of payment confirmation of the license granting fee, in case of license granting, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for sanitation service no. 15*

Request for a license for the public sanitation service of localities or for one or more specific activities of this service, provided through the direct management method by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-directa-salubrizare/

Resolution time: 60 days from the registration of the documentation or 30 days from the transfer by the public utilities service operator of the requested additions by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing him of the obligation to make additions, corrections, or clarifications regarding the request and the submitted documents, within 30 days from the registration of the documentation.

In case, within 30 days from the date of the address requesting additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, removing the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, in order to clarify certain aspects that result/do not result from the provided documentation;

b) verifying, on site, the authenticity of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report that includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal to grant/reject the license is put to vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the fee for granting the license, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After payment confirmation, A.N.R.S.C. sends to the applicant within maximum 5 days, the order of the president of A.N.R.S.C. for granting the license together with the license and its associated conditions.

In case of failure to meet the 30-day deadline for paying the fee for granting the license, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends to the applicant within maximum 5 days from the issue, the order of the president of A.N.R.S.C. for rejection of the license together with the reasons for refusing it.

In the situation where the granting of the license was rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order to grant the license, together with the license and the associated conditions;

b) Order to reject the license, together with the reasons for the refusal;

c) Notification regarding the removal of the request from the procedure.

Notification term upon the expiration of the resolution term: 5 days from the date of confirmation of payment of the license granting fee, in case of granting the license, or 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-salubrizare/


*
PROCEDURA
Companii
National

License request for public water supply service no. 08*

Request for license for the public water supply service, provided through delegated management by specialized providers established as commercial companies-https://www.anrsc.ro/gestiune-delegata-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the submission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications regarding the application and the submitted documents, within 30 days from the registration of the documentation.

If within 30 days from the date of the request for additions the applicant does not provide all the relevant documentation as provided by the regulation, including the requested additions, A.N.R.S.C. will return this documentation and delete the respective application from the licensing procedure, notifying the applicant of this decision.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) the summoning, at the A.N.R.S.C. headquarters, of the applicant's authorized representatives in order to clarify certain aspects that arise/do not arise from the submitted documentation;

b) verification, on site, of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report which includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission by the commission secretary.

The proposal for granting/rejecting the license is put to a vote within the Licensing Commission.

Granting/rejecting the license is done by an order of the president of A.N.R.S.C..

In case the license is granted, A.N.R.S.C. communicates to the applicant the invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of receipt of the invoice.

After confirming the payment, A.N.R.S.C. sends to the applicant within a maximum of 5 days the order of the president of A.N.R.S.C. for granting the license accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day period for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends to the applicant within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. for rejection of the license together with the reasons for refusal.

In the case where the license granting has been rejected, the applicant cannot submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order granting the license, accompanied by the license and the associated conditions;

b) Order rejecting the license, accompanied by the reasons for refusal;

c) Notification regarding the deletion of the application from the procedure.

Notification period after the expiration of the processing period: 5 days from the date of confirmation of the payment of the granting fee, in case of granting the license, respectively 5 days from the date of issuance of the rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for the public water supply and sewerage service no. 04*

Request for a license for the public water supply and sewerage service, provided/performed through the delegated management modality by specialized providers constituted as commercial companies-https://www.anrsc.ro/gestiune-delegata-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the requested completions by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications referring to the request and submitted documents, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the relevant documentation, deleting the respective request from the procedure for granting the license, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) convening, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the reality of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialist report including a justified proposal for granting/rejection of the license, which will be presented for analysis to the Licensing Commission by the commission secretary.

The proposal for granting/rejecting the license is put to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In the case of granting the license, A.N.R.S.C. communicates to the applicant the tax invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After payment confirmation, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the president's order of granting the license accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day term for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the president's order of license rejection along with the reasons for refusal.

For situations where the granting of the license was rejected, the applicant cannot submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order of granting the license, accompanied by the license and the conditions associated with the license;

b) Order of license rejection, accompanied by the reasons for refusal;

c) Notification regarding the removal of the request from the procedure.

Notification deadline for expiration of the resolution term: 5 days from the date of confirmation of payment of the license granting fee, in the case of license granting, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for sanitation service no. 14*

License request for the public sanitation service of localities or for one or more specific activities of this service, provided through direct management by commercial companies with wholly public capital - https://www.anrsc.ro/gestiune-directa-salubrizare/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the supplements requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for granting the license for a service/activity of public utility are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications concerning the request and the documents submitted, within 30 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation provided by the regulations, including the requested additions, A.N.R.S.C. will return the related documentation, removing the respective request from the license granting procedure, and will communicate this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) the summoning, at the A.N.R.S.C. headquarters, of the authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the truthfulness of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialist report which includes the justified proposal for granting/rejecting the license and which will be submitted for analysis to the Licensing Commission, by the commission secretary.

The proposal for granting/rejecting the license is submitted to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the A.N.R.S.C. president.

In the case of granting the license, A.N.R.S.C. will notify the applicant about the invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of invoice notification.

After confirmation of payment, A.N.R.S.C. sends the applicant within a maximum of 5 days, the president's order for license granting, accompanied by the license and its associated conditions.

If the 30-day deadline for payment of the license granting fee is not observed, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the president’s order to reject the license, accompanied by the reasons for refusal.

In the situation where the granting of the license was rejected, the applicant may not submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order granting the license, accompanied by the license and the conditions associated with the license;

b) Order rejecting the license, accompanied by the reasons for the refusal;

c) Notification regarding the removal of the request from the procedure.

Notification deadline upon expiration of the resolution period: 5 days from the date of payment confirmation of the license granting fee, in the case of license granting, or 5 days from the date of the issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-salubrizare/

*
PROCEDURA
Companii
National

License request for public sewerage service no. 11*

License application for the public sewage service, provided under the delegation of management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities operator of the completions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications, regarding the request and the submitted documents, within 30 days from the registration of the documentation.

If , within 30 days from the request letter for additions, the applicant does not provide all the appropriate documentation as required by the regulations, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, deleting the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) the summoning, to the A.N.R.S.C. headquarters, of authorized representatives of the applicant, in order to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, drafts a specialty report which includes the justified proposal of granting/rejecting the license and which will be presented for analysis to the Licensing Committee by the secretary of the committee.

The proposal for granting/rejecting the license is subject to a vote within the Licensing Committee.

The granting/rejection of the license is made by order of the president of A.N.R.S.C..

In the case of license granting, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After payment confirmation, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. for granting the license, accompanied by the license and its associated conditions.

In case the 30-day term for paying the license granting fee is not respected, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. for license rejection, accompanied by the reasons for refusing the granting.

For the situation where the license granting has been rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order of granting the license, accompanied by the license and the conditions associated with the license;

b) Order of license rejection, accompanied by the reasons for refusal to grant;

c) Notification regarding deletion of the application from the procedure.

Notification period upon expiry of the processing deadline: 5 days from the date of confirmation of payment of the license granting fee, in the case of license granting, or 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for public water supply service no. 05*

Request for a license for the public water supply service, provided by the direct management method by local or county public services of local interest, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units - https://www.anrsc.ro/gestiune-directa-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of obtaining a license for a public utility service/activity are analyzed by A.N.R.S.C., and in if necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications, regarding the application and the documents submitted, within 30 days from the registration of the documentation.

In case , within 30 days from the date of the notice requesting additions, the applicant does not provide all the corresponding documentation required by the regulations, including the requested additions, A.N.R.S.C. will return the relevant documentation, deleting the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at A.N.R.S.C. headquarters, the authorized representatives of the applicant, in order to clarify certain aspects arising/not arising from the documentation provided;

b) on-site verification of the reality of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialist report which includes the justified proposal to grant/reject the license, which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is put to the vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. sends the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After confirmation of payment, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day deadline for the payment of the license granting fee, A.N.R.S.C. will proceed with the withdrawal of the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from the issuance, the order of the president of A.N.R.S.C. rejecting the license, along with the reasons for the refusal to grant it.

In the event that the granting of the license is refused, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order to grant the license, accompanied by the license and the conditions associated with the license;

b) Order to reject the license, accompanied by the reasons for the refusal to grant;

c) Notification regarding the deletion of the application from the procedure.

Notification deadline upon expiration of the settlement term: 5 days from the date of confirmation of payment of the license granting fee, in case of license granting, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
National Regulatory Authority for Community Public Utility Services*
Str. Lucian Blaga, nr. 4, Sectorul 3
Telefon: 0213179751
Fax: 0213179752
Email: cabinet@anrsc.ro

Assistance services

There are no Assistance services registered by this institution

Institutional structure

Autoritatea Naţională de Reglementare pentru Servicii Comunitare de Utilităţi Publice
Direcţia reglementări, autorizări, prețuri și tarife
A.D.R.
This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
Your Europe
PNRR
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro