Authorization - constructions*

favorite_border
Add favorite
Procedure
Online
Companii
Cetateni
National

Issuance of authorization for placement of constructions, economic objectives, intersection arrangements in the road area, and arranging access to the county road.

Observations:

  • The placement distances of economic objectives that generate additional traffic from the edge of the carriageway of the county road, outside localities, must be at least 30 m, in accordance with art. 47, para. 1 of G.O. 43/1997 with subsequent amendments and completions. Constructions that generate additional traffic include production units, commercial complexes, wholesale warehouses, showroom-type units, tourist objectives, residential districts, industrial parks, as well as any other similar objectives and/or constructions where economic activities are carried out.

  • In the preparation of the documentation, the provisions of G.O. 43/1997 regarding the legal regime of roads with subsequent amendments and completions, Order of the Ministry of Transports no. 1835/2017 for the approval of the Technical Norms regarding the design and placement conditions of constructions, installations, and advertising means in the road areas, on bridges, passages, viaducts, in road tunnels, as well as arranging access ways to public roads, H.G. 525/1996 for the approval of the General Urbanism Regulation, the Normative regarding intersection arrangements, indicative AND 600/2010, standards SR 1848/1/2/3 – 2011, SR 1848/7 – 2015, STAS 1848/5-82 regarding road signage, shall be observed.

  • The documentation will be correlated with the approved urban plans (PUG / PUZ) for the studied area and with the approvals issued for the accesses to the county road.

  • The documentation prepared by a road specialist designer will have the original signature and stamp of the designer and of the certified project verifier.

  • Each drawing will have, at the bottom right, a title block that will include: the name of the design firm that prepared the project, the registration or authorization number, as the case may be, the title of the project and drawing, the project and drawing number, date of elaboration, the name, position, and signature of the preparer, verifier, and the project manager, in accordance with annex no. 3 to the Order of the Ministry of Regional Development and Housing no. 839 of October 12, 2009 for the approval of the Methodological Norms for the application of Law no. 50/1991 regarding the authorization of construction works execution, with subsequent amendments and completions.

Note: Upon the request of D.J.A.D.P. Iași, other documents/plans/details besides those specified in the "Necessary documents" section will be submitted if the situation requires it.
*
Entitled persons
Regulated professions
Required documents

Denumire

Descriere

Obligatoriu

Semnătură digitală

Tip document

Descarcă


-
Request*
Descarcă
Scanned document
Signed and stamped request from the beneficiary in which the following must be obligatorily specified: company information – full address, telephone/fax number, e-mail, account number, bank where the account is opened, names of the company's legal representatives, their positions, name of the person designated (within the company) to be responsible for compliance with the authorization conditions, legal status of the land.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Prior consent*
Descarcă
Scanned document
The prior approval issued by D.J.A.D.P. Iaşi in case it has been obtained.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Notice of the Road Service*
Descarcă
Scanned document
The notice of the Road Service within the Iaşi County Police Inspectorate.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
ID*
Descarcă
Scanned document
Copy of the identity document of the person responsible for complying with the conditions of the authorization.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Ownership documents*
Descarcă
Scanned document
Ownership / concession / lease / loan-for-use documents for the land, accompanied by cadastral plans endorsed by the County Office of Cadastre and Real Estate Publicity.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Urbanism certificate*
Descarcă
Scanned document
Urbanism certificate.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Photographs*
Descarcă
Scanned document
Relevant digital photographs from the area of the county road and the designed objective; the name of the photograph will be DJ and the km position and the direction of travel on DJ (county road).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The company's documents*
Descarcă
Scanned document
The company's documents: certificate of incorporation, tax registration certificate, articles of association, decision.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The report of the project checker*
Descarcă
Scanned document
The report of the certified project inspector for requirements - A4, B2, D - according to Law 10/1995 and MLPTL Order no. 777/2003.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Technical memorandum*
Descarcă
Scanned document
Technical presentation memorandum of the proposed work, which will include: existing situation; land integration in the General Urban Plan approved by D.J.A.D.P. Iaşi; the designed solution, description of the works subject to the project for approval with references to the site (including the road and km position), its topography; description of the objective's activity; attracted traffic (evaluation of the type of attracted traffic and the number of vehicles during peak hour); presentation of the access solution to the county road, location of the buildings in relation to the geometric elements of the county road; adopted road structure for the arrangement of the access road / side road / collector road (as appropriate); traffic study (circulation capacity, level of service) in the case of commercial complexes; method of solving the continuity of stormwater drainage along the county road in the area of the objective and the intersection; method of collecting and discharging stormwater and wastewater from the site; type of existing cross-section; existing and proposed road signage for traffic regulation under the new conditions, designed in accordance with SR 1848/1/2/3 – 2011, SR 1848/7 – 2015, STAS 1848/5-82; structure of the road system for the designed access; a road system equivalent to that of the county road will be adopted; method of lighting the intersection at night, if applicable; situation of road plantations; presentation of the geometric elements of the collector road or the service road, if applicable; method of ensuring road traffic during the execution of works, km position of the collector road (if applicable); visibility distances on the county road in the area of the intersection with the access road; calculation of the number of parking spaces, in accordance with HG 525/1996.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Zoning plan*
Descarcă
Scanned document
Zoning plan on which the location of the land will be marked.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Site plan*
Descarcă
Scanned document
Site plan at 1/500 scale which will be prepared on a topographic base, highlighting the elevation points, based on the plan endorsed and certified by the Office of Cadastre and Real Estate Publicity, regarding the neighboring properties and the boundaries of the land. The site plan will include: the cadastral plot for which the urbanism certificate was issued, the neighboring properties along the county road on both sides of the objective (along the county road on both sides) over a length of 100 m, showing all accesses / buildings / collector road (specifying sizes and distances); the intersections of the collector road with the county road (if applicable); the projected and existing buildings, the location of fuel pumps / canopy / tanks (in the case of fuel distribution stations), the dimensions, names, and purposes of each building unit, fencing, distances from the centerline of the county road to the constructions, fences, fuel tanks, fuel dispensing pumps; the distance from the property boundary to the centerline of the county road and to the edge of the roadway will be specified; the access solution to the county road through direct access / side road / easement / collector, etc.; pedestrian and vehicular accesses inside the property, sidewalks, traffic flow scheme, the solution for developing road access to the county road; the kilometer and meter positions of the land and the access to the county road; vertical systematization of the land; existing and proposed road signage (vertical and horizontal) for traffic regulation under new conditions; parking spaces in accordance with HG 525/1996; the system for collecting and discharging water from the premises, the septic tank, the hydrocarbon separator, etc.; on the site plan, a simulation of the route of the fuel tanker supplying the tank (in the case of fuel stations), as well as the route of long vehicles using the services of the objective, will be presented.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Situation plan*
Descarcă
Scanned document
Site plan with vertical systematization of the enclosure, sewer network, and hydrocarbon separator.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Transversal profiles*
Descarcă
Scanned document
Transversal profiles of the county road at a scale of 1/100 (1/50) at the intersection (in the axis and the traffic lanes related to the access) and arrangements indicating the structure of the proposed road system for the new access/side road, the system ensuring the continuity of rainwater along the county road, the geometric elements of the county road, ground elevations, project elevations, slopes, raised island, distances from the geometric elements of the county road to the designed buildings, etc.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Transversal profiles*
Descarcă
Scanned document
Transversal profiles through the collector road (if applicable).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Execution detail sheets*
Descarcă
Scanned document
Details for the systems ensuring the drainage of rainwater along the road.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Execution detail sheets*
Descarcă
Scanned document
Details for the road system related to the access with the corresponding connections to the county road.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Local Council Decision*
Descarcă
Scanned document
The Local Council Decision approving the ZUP/UGP.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Point of view*
Descarcă
Scanned document
The standpoint of the consultancy/design firm regarding the modernization/rehabilitation works of the county road in the case where the site is located on a road section undergoing rehabilitation/modernization or in the vicinity of the route of a future road.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Notarial declarations*
Descarcă
Scanned document
Notarial statements (as applicable) regarding the consent of neighboring landowners for the construction of access roads on the property.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Notarial statement*
Descarcă
Scanned document
The notarial declaration by which the applicant grants permission for the construction of the collector road and its use by the owners of the neighboring lands.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Agreement*
Descarcă
Scanned document
The agreement of the owner/administrator of the side road (if applicable).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Issued documents

Denumire

Tip document

Descarcă


-
Authorization for placement of works in the public road area*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Fees

Title

Payment method

Value

Currency


Taxă fixă
OP
Deadlines
Resolution time:
30
Calendar days
Case filling duration:
30
Calendar days
Notification deadline:
5
Calendar days
Legislation
Appeal routes
In case of a dispute between the beneficiary and the competent authority, the provisions of common law shall apply.

*
Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated: 
02 August 2022
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Institution responsible with document: 
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Iasi County Directorate of Roads and Bridges Administration*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
Iasi County Directorate of Roads and Bridges Administration*
B-dul Ştefan cel Mare şi Sfânt nr. 13, Iasi, RO
Telefon: 0232255961
Fax: 0232255960
Email: contact@djadp.ro
Table of contents

Competent entities

Compartiment Avizare şi Control Trafic
A.D.R.
This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
Your Europe
PNRR
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro