Home
Home
Single digital gateway for public services
favorite_border

Request for fire safety authorization*

favorite_border
Add favorite
Procedure
Online
Companii
Cetateni
Institutii
National

Details
Request for fire safety authorization
*
Entitled persons
Regulated professions
Required documents

Denumire

Descriere

Obligatoriu

Semnătură digitală

Tip document

Descarcă


-
a) standard request;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
a) standard application form;*
b) the building permit;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
b) the building permit;*
c) the fire safety approval and the endorsed documentation which formed the basis for issuing the approval - original;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
c) the fire safety approval and the supporting documentation endorsed as unchanged which formed the basis for issuing the approval - original;*
d) copy of the fire safety scenario approved to remain unchanged, or another safety scenario if modifications occur*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
d) copy of the fire safety scenario endorsed for unchangeability, which formed the basis for issuing the fire safety permit, or another safety scenario if there are changes compared to the endorsed one that formed the basis for obtaining the fire safety permit or if such a document was not drawn up;*
e) situation plan, scale 1:200, 1:500 or 1:1000;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
e) the site plan, scale 1:200, 1:500 or 1:1000;*
f) pieces drawn to a scale of 1:50, 1:100 or 1:200, as appropriate, for architecture*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
f) pieces drawn at a scale of 1:50, 1:100 or 1:200, as appropriate, for architecture, which include the fire safety measures and installations with the role of ensuring the "fire safety" requirement, from the technical documentation at the project design stages - technical project - P.Th. and execution details;*
g) parts drawn to scale 1:50, 1:100 or 1:200*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
g) parts drawn at a scale of 1:50, 1:100 or 1:200, as appropriate, for architecture, which include fire safety measures and installations with a role in ensuring the "fire safety" requirement, and, as appropriate, execution details, covering the proposed situation;*
h) plans at a scale of 1:50, 1:100 or 1:200, as applicable, of the installations with a role in ensuring the fire safety requirement, as applicable, at the P.Th. design phase and execution details;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
h) plans at scale 1:50, 1:100 or 1:200, as applicable, of the installations with a role in ensuring the fire safety requirement, as applicable, at the P.Th. design stage and execution details;*
i) installation diagram, electrical and functional diagrams of the fire pumping station, fire water supply system diagram, as applicable, at the P.Th. design phase and execution details;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
i) installation diagram, electrical and functional diagrams of the fire pumping station, diagram of the fire water supply, as applicable, at the P.Th. design phase and execution details;*
j) parts drawn at 1:50, 1:100 or 1:200 scale*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
j) the parts drawn at a scale of 1:50, 1:100 or 1:200, as applicable, such as: floor plans with the placement of installations, isometric diagram, diagram of the columns, as applicable, for the interior extinguishing installations, at the P.Th. design phase and execution details;*
k) water supply scheme for fire, electrical and functional diagrams of the fire pumping station and the hydrophore station*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
k) the water supply scheme for fire protection, electrical and functional diagrams of the fire pump station and the hydrophore station, electrical and operation diagrams of the installation, etc., as applicable, for the interior extinguishing installations, at the P.Th. design phase and execution details;*
l) block diagram of the installation, floor plans showing the location of the installation at a scale of 1:50, 1:100 or 1:200*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
l) block-diagram of the installation, floor plans showing the placement of the installation at a scale of 1:50, 1:100 or 1:200, as applicable, for fire detection, signaling and alarm installations, in the P.Th. design phase and execution details;*
m) as-built surveys for each level, section, and facade of the construction*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
m) survey of the existing situation for each level, section, and facade of the construction, as applicable, at a scale of 1:50, 1:100 or 1:200, as applicable, where, as applicable, the proposed modifications are marked;*
n) site instructions endorsed by the certified project verifier, inspection report of the quality of the works*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
n) site provisions endorsed by the certified project verifier, inspection-acknowledgment report of work quality, inspection report for checking the quality of works that become covered, etc., which must include the measures taken regarding the fulfillment of the fundamental requirement "fire safety";*
o) the report of the certified project verifier for the fundamental requirement of fire safety*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
o) the report of the certified project verifier for the fundamental requirement "fire safety", constructions and/or installations at the stages of technical design project - P.Th. and execution details;*
p) the handover report upon completion of the works;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
p) the minutes of acceptance upon completion of the works;*
q) list of documents attesting the fire performance of the products*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
a) the list of documents attesting the fire performance of construction products that play a role in satisfying the fundamental requirement "fire safety" or those with fire behavior performance;*
r) layout plan at a scale of 1:100 or 1:200, as the case may be;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
r) layout plan at a scale of 1:100 or 1:200, as applicable;*
r) layout plan at a scale of 1:100 or 1:200, as applicable;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
r) layout plan at scale 1:100 or 1:200, as applicable;*
s) the evacuation plan for persons;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
s) the evacuation plan for persons;*
t) drawn parts, scale 1:50, 1:100 or 1:200, as appropriate, with the station enclosure*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
t) drawn parts, scale 1:50, 1:100 or 1:200, as appropriate, with the station enclosure where the distance between its constituent elements is mentioned or copies of these plans, endorsed to remain unchanged, which were the basis for issuing the fire safety approval, if no changes have occurred;*
u) installation diagram and plan with EX zoning*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
u) the installation diagram and plan with EX zoning or their copies, endorsed as unchanged, which were the basis for issuing the fire safety approval, if no changes have occurred;*
v) the plan at a scale of 1:50, 1:100 or 1:200, as appropriate, including the minimum distances*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
v) the plan at scale 1:50, 1:100 or 1:200, as applicable, including the minimum distances between the metallic liquefied petroleum gas pipelines and other installations, constructions or underground obstacles;*
w) the 1:100 or 1:200 scale plan of the external hydrant network;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
w) the plan at scale 1:100 or 1:200 of the exterior hydrant network;*
x) the diagram of the system for supplying consumers with liquefied petroleum gases and the plan with EX zoning;*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
x) the system diagram for supplying consumers with liquefied petroleum gases and the plan with EX zoning;*
y) description with the submitted documents.*
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
y) description with the submitted documents.*
Issued documents

Denumire

Tip document

Descarcă


-
Fire safety authorization*
obligatoriu cu semnatură digitală disponibil și prin OOTS
Fees

Title

Payment method

Value

Currency


None
Deadlines
Resolution time:
30
Calendar days
Case filling duration:
5
Calendar days
Notification deadline:
0
Calendar days
Appeal routes
In the event of a dispute between the beneficiary and the competent authority, the provisions of common law shall apply.
*
Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated: 
15 March 2021
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Institution responsible with document: 
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Dobrogea Constanta Emergency Situations Inspectorate*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
mun. Constanta, str. Mircea cel Batran nr. 110
Telefon: 0241697381
Fax: 0241697382
Email: urgente@isudobrogea.ro
Table of contents

Competent entities

Compartimentul avizare autorizare
A.D.R.
This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
Your Europe
PNRR
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro