Issuance of authorization for construction placement, economic objectives, intersection arrangements in the road area, and access arrangement to the county road.
Observations:
- The placement distances for economic objectives that generate additional traffic, from the edge of the carriageway of the county road, outside localities, of at least 30 m, shall be observed, in accordance with art. 47, para. 1 of O.G. 43/1997 with subsequent amendments and completions. By constructions that generate additional traffic, it is meant productive units, commercial complexes, wholesale warehouses, show-room type units, tourist objectives, residential neighborhoods, industrial parks, as well as any other objectives and/or similar constructions in which economic activities are carried out.
- When preparing the documentation, the provisions of O.G. 43/1997 regarding the legal regime of roads with subsequent amendments and completions, Order of the Ministry of Transport no. 1835/2017 for the approval of the Technical Norms regarding the conditions for the design and placement of constructions, installations and advertising means in the area of roads, on bridges, overpasses, viaducts, in road tunnels, as well as the arrangement of access roads to public roads, HG 525/1996 for the approval of the General Urbanism Regulation, the Normative regarding the arrangement of intersections, AND 600/2010, standards SR 1848/1/2/3 – 2011, SR 1848/7 – 2015, STAS 1848/5-82 regarding road signaling shall be observed.
- The documentation will be correlated with the approved urban planning plans (PUG / PUZ) for the studied area and with the approvals issued for accesses to the county road.
- The documentation drawn up by a road specialty designer will have the original signature and stamp of the designer and the certified project verifier.
- Each drawing sheet will have a box at the bottom right which will include: the name of the design company that created the project, the registration number or authorization, as applicable, the title of the project and the sheet, the project and sheet number, the date of drafting, the name, position, and signature of the person who drafted, verified, and the project manager, in accordance with annex no. 3 to the Order of the Ministry of Regional Development and Housing no. 839 of October 12, 2009 for the approval of the Methodological Norms for the application of Law no. 50/1991 regarding the authorization of construction works, with subsequent amendments and completions.
Note: Upon request of D.J.A.D.P. Iaşi, other documents/plans/details besides those specified in the "Required documents" section will also be presented if the situation so requires.
*Entitled persons
Regulated professions
Required documents
Denumire
Descriere
Obligatoriu
Semnătură digitală
Tip document
Descarcă
-
Request*
Descarcă
Request signed and stamped by the beneficiary in which the following must be specified: company information – full address, phone/fax number, email, account number, the bank where the account is opened, names of the company's legal representatives, their positions, the name of the person designated (from the company) to be responsible for compliance with the conditions in the authorization, the legal status of the land.*
Prior agreement*
Descarcă
The prior agreement issued by D.J.A.D.P. Iaşi in case it has been obtained.*
Notice of the Road Service*
Descarcă
The approval of the Road Service within the Iași County Police Inspectorate.*
I.D.*
Descarcă
Copy of the identity document of the person responsible for complying with the conditions of the authorization.*
Ownership documents*
Descarcă
Ownership / concession / land rental / loan agreements accompanied by the cadastral plans approved by the County Office of Cadastre and Real Estate Publicity.*
Urbanism Certificate*
Descarcă
Urbanism certificate.*
Photographs*
Descarcă
Relevant digital photographs from the area of the county road and the designed objective; the name of the photograph will be DJ and the km position and the direction of travel on the DJ (county road).*
The company's documents*
Descarcă
The company's documents: certificate of registration, fiscal registration certificate, articles of association, decision.*
The report of the project verifier*
Descarcă
The report of the certified project verifier for requirements - A4, B2, D - according to Law 10/1995 and MLPTL Order no. 777/2003.*
Technical memorandum*
Descarcă
Technical presentation memorandum of the proposed work which will include: current situation; land classification in the General Urban Plan approved by D.J.A.D.P. Iaşi; designed solution, description of the works that are the subject of the project for approval with references to the site (including the road and km position), its topography; description of the activity of the objective; attracted traffic (evaluation of the type of attracted traffic and number of vehicles during peak hour); presentation of the access solution to the county road, placement of buildings relative to the geometric elements of the county road; adopted road structure for the arrangement of the access road / side road / collector (if applicable); traffic study (circulation capacity, level of service) in case of commercial complexes; method of solving the continuity of rainwater drainage along the county road in the area of the objective and intersection; method of collecting and discharging rainwater and wastewater from the site; type of existing cross-sectional profile; existing and proposed road signage for regulating traffic in the new conditions, designed in accordance with SR 1848/1/2/3 – 2011, SR 1848/7 – 2015, STAS 1848/5-82; structure of the road system for the designed access; an equivalent road system will be adopted with that pertaining to the county road; method of intersection lighting at night, if applicable; situation of roadside planting; presentation of the geometric elements of the collector road or service road, if applicable; method of ensuring traffic circulation during the execution of works, km position of the collector road (if applicable); visibility distances on the county road in the area of its intersection with the access road; calculation of the number of parking spaces, in accordance with HG 525/1996.*
Zoning plan*
Descarcă
Plan for zoning in which the location of the land will be marked.*
Situation plan*
Descarcă
Situation plan at a scale of 1/500, which will be drafted on a topographic support highlighting the elevations, based on the plan endorsed and certified by the Office of Cadastre and Real Estate Publicity, regarding the neighboring properties and land boundaries. The situation plan will include: the cadastral plot for which the urbanism certificate was issued, the neighboring properties along the county road on both sides of the objective (along the county road on both its sides) over a length of 100 m, showing all accesses / buildings / collector road (specifying dimensions and distances); the intersections of the collector road with the county road (if applicable); the projected and existing buildings, the placement of fuel pumps / canopy / tanks (in the case of fuel distribution stations), the dimensions, names, and purposes of each building entity, the fencing, the distances from the axis of the county road to constructions, fences, fuel tanks, fuel delivery pumps; the distance from the property boundary to the axis of the county road and to the edge of the paved road surface will be specified; the access solution to the county road through direct access / through side road / through easement / collector, etc.; pedestrian and vehicle accesses within the property, sidewalks, traffic flow diagram, the solution for arranging vehicle access to the county road; the kilometer and meter positions of the land and access to the county road; vertical systematization of the land; existing and proposed road signage (vertical and horizontal) to regulate traffic under the new conditions; parking spaces in accordance with HG 525/1996; the system for collecting and discharging waters from the premises, the septic tank, hydrocarbon separator, etc.; the situation plan will present a simulation of the route of the fuel supply tanker to the tank (in the case of fuel stations), as well as the route of long vehicles using the services of the objective.*
Situation plan*
Descarcă
Site plan with vertical systematization of the enclosure, the sewer network, and the hydrocarbon separator.*
Cross profiles*
Descarcă
Transverse profiles of the county road at a scale of 1/100 (1/50) at the intersection (in the axis and the traffic lanes related to the access) and arrangements indicating the structure of the proposed road system for the new access/side road, the system for ensuring continuity of rainwater along the county road, geometric elements of the county road, ground elevations, project elevations, slopes, raised island, distances from the geometric elements of the county road to the designed buildings, etc.*
Transversal profiles*
Descarcă
Transversal profiles through the collector road (if applicable).*
Execution detail drawings*
Descarcă
Details for the systems ensuring the drainage of rainwater along the road.*
Execution detail sheets*
Descarcă
Details for the road system related to access with the connections to the county road.*
Local Council Decision*
Descarcă
The Local Council Decision approving the PUZ/PUG.*
Point of view*
Descarcă
The point of view from the consultancy/design company regarding the modernization/rehabilitation works of the county road in case the location is on a road section undergoing rehabilitation/modernization or in the vicinity of the route of a future road.*
Notarial statements*
Descarcă
Notarial declarations (where applicable) regarding the agreement of neighboring landowners for the construction of access roads on the property land.*
Notarial declaration*
Descarcă
The notarial declaration by which the applicant grants permission for the construction of the collector road and its use by the owners of the neighboring lands.*
Agreement*
Descarcă
The agreement of the owner/administrator of the side road (if applicable).*
Fees
Title
Payment method
Value
Currency
Taxă fixă
OP
273
RON
Deadlines
Resolution time:
30
Calendar days
Case filling duration:
30
Calendar days
Notification deadline:
Calendar days
Legislation
Appeal routes
In the case of a dispute between the beneficiary and the competent authority, the common law provisions shall apply.
*Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated:
30 June 2026
Publicat de către:
A paragraph is a self-contained unit of a discourse in writing dealing with
a particular point or idea. Paragraphs are usually an expected part of
formal writing, used to organize longer prose.
Institution responsible with document:
Publicat de către:
A paragraph is a self-contained unit of a discourse in writing dealing with
a particular point or idea. Paragraphs are usually an expected part of
formal writing, used to organize longer prose.
Iasi County Directorate for Road and Bridge Administration*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
B-dul Ştefan cel Mare şi Sfânt nr. 13, Iasi, RO
Telefon:
0232255961
Fax:
0232255960
Email:
contact@djadp.ro
Table of contents
Competent entities
Compartiment Avizare şi Control Trafic
Share your opinion
Provide your opinion about the content of this page. You can leave acomment about what we can improve. You will not receive a response toyour comment. Use the contact form to clarify any questions regardingthe information and services available on this portal.
Did you find what you were looking for?
Help us improve