The reception of construction works is carried out for the purpose of: - finalizing the process of constructing authorized works, by regularizing the AC fee and registering the property in the local tax records for taxation; - registering the constructions/parts of the construction in the Land Register. Reception report at the completion of works The document certifying the following: the works have been fully executed; the provisions of the construction/demolition permit have been fully complied with; the works have been executed in accordance with the provisions of the works/execution contract, the design documentation, the execution documentation, and the specific regulations.

Service provided exclusively at the counter

Service cost

No costs, except in situations where, upon regularization of the authorization fee, a difference in AC fee and late payment increases must be paid for failing to carry out the reception within the legal term.

*
Entitled persons
Regulated professions
Required documents

Denumire

Descriere

Obligatoriu

Semnătură digitală

Tip document

Descarcă


-
The building/demolition permit(s)*
Descarcă
Scanned document
Original*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Notification of commencement of works execution*
Descarcă
Scanned document
Original*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The specialty reports (architecture, structural, installations) prepared by the designers, regarding the manner in which the work was carried out*
Descarcă
Scanned document
Original*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Site provisions*
Descarcă
Scanned document
1 original copy, if applicable, according to legal provisions*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The site supervisor's report regarding the manner in which the work was carried out*
Descarcă
Scanned document
Original*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The energy performance certificate, if applicable*
Descarcă
Scanned document
Original*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Proof of payment of the quotas to the Prahova County Inspectorate for Construction (0.1% and 0.5%) / certificate issued by ISC confirming the payments made*
Descarcă
Scanned document
Original*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
statement regarding the real value of the works executed based on the building permit, completed in the first part, without stating the real value, as this will result after the fee regularization*
Descarcă
Scanned document
1 original copy – annex 2*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The acceptance report upon completion of works*
Descarcă
Scanned document
minimum 2 copies – original – annex 3*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Balance / accounting note with the value of the investment*
Descarcă
Scanned document
signed and stamped, in original - for legal entity beneficiaries*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
within the reception procedure, before the reception report is signed by the representative of the local public administration, the building permit fee will be regularized and any differences in fees will be paid*
Descarcă
Scanned document
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The reception committee at the completion of the works meets at the date, time, and place set by the investor, where the documents, the physical stage of the work, and the compliance with the building permit are checked. If the work is completed and the provisions of the building permit are respected, the reception minutes are signed. If the work is not completed/does not comply with the provisions of the building permit, the work is not received and a report is drawn up in which certain measures are ordered.*
Descarcă
Scanned document
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Communication regarding the completion of the works execution*
Descarcă
Scanned document
form F15 from annex no. 1 to Order 839/2009 – annex 1*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Issued documents

Denumire

Tip document

Descarcă


-
None
Fees

Title

Payment method

Value

Currency


None
Deadlines
Resolution time:
30
Calendar days
Case filling duration:
15
Calendar days
Notification deadline:
0
Calendar days
Appeal routes

CIVIL CODE

*
Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated: 
02 August 2023
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Institution responsible with document: 
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Campina Municipality City Hall*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
Campina Municipality City Hall*
BD CULTURII NR 18
Telefon: 0244336134
Fax:
Email: web@primariacampina.ro
Table of contents

Competent entities

SERVICIUL URBANISM SI AMENAJAREA TERITORIULUI
A.D.R.
This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
Your Europe
PNRR
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro