Notification of execution of construction works based on the simplified procedure

The procedure applies to construction works provided for in art. 294 of Law no. 169/2026 regarding the Code of territorial planning, urbanism and constructions, in compliance with the legal conditions and applicable urban regulations.

The execution of construction works based on the simplified procedure of notification provided in art. 294 of Law no. 169/2026 is carried out with observance of:

- applicable legal provisions regarding quality in constructions,

- the specific legislation regarding environmental impact assessment and appropriate assessment,

- approved urban planning documentation,

- applicable legal provisions regarding protection of cultural heritage.

According to art. 295 para. (1)–(3), the notification is sent to the competent local public administration authority, prior to commencement of works, by the holder of a principal real right over the building or of a claim right, as applicable.

According to art. 295 para. (9), requests regarding the classification of works under a certain authorization regime do not represent notifications in the sense of this procedure.

Required documents:

1. Notification form, completed and signed — art. 295 para. (4) and (10).

2. Simplified-content technical execution project, prepared by specialists according to the competences and specifics of the project — art. 295 para. (4), with written and drawn documents to allow identification of the building, presentation of the existing situation and a complete description of the proposed works, as well as the technical solutions for their realization. The project will be drawn up for the necessary specialties for the intervention and correlated with the technical expertise.

Simplified-content technical execution project, which will include the architecture, structure, and installations documentation, prepared and assumed by specialists according to legal competences, correlated with each other and with the conclusions and measures established by the technical expertise.

If the proposed intervention does not involve works on the structure and/or installations, for each of these specialties at least a technical report will be presented, prepared and assumed by the competent specialist, justifying the fact that such works are not necessary.

3. Additional documentation, in the cases provided by law — art. 295 para. (7).

4. Proof of payment of the legal fees for the issuance of authorizations — art. 295 para. (4). According to art. 313 para (4) For works under the simplified procedure, the amount of the fee charged by the local authority is equal to half of the fee established by Law no. 227/2015, as amended and supplemented, for issuing the authorization for construction, arrangement, modification, regularization, or demolition, depending on the type of proposed works.

Payment may also be made at https://www.e-primariaclujnapoca.ro/taxe.

Resolution term: 15 working days from registration of the notification, according to art. 296 para. (1) of Law no. 169/2026. In case clarifications are requested, the term is related to the date of their registration, under the same article.

Commencement of works: 15 calendar days after the fulfillment of the silent approval deadline or, where appropriate, after the complete fulfillment of the communicated conditions, according to art. 296 para. (6).

The department handling the application is the Urbanism Directorate, Urbanism Service.

*
Entitled persons

Holders of a principal real right over the property or of a claim right, as applicable, according to art. 295 para. (2) of Law no. 169/2026.

*
Regulated professions
Required documents

Denumire

Descriere

Obligatoriu

Semnătură digitală

Tip document

Descarcă


-
Standard request / application
Descarcă
Smart form
obligatoriu cu semnatură digitală disponibil și prin OOTS
Property document
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
MANDATORY: -the updated land registry excerpt,*
Property document
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
Technical expertise, drawn up by a certified technical expert, for the purpose of substantiating interventions on the existing construction and establishing the conditions and measures necessary to comply with the quality requirements in constructions.*
Property document
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
Point of view of the competent environmental protection authority, for the purpose of establishing the applicable requirements for the proposed works regarding environmental impact assessment and appropriate assessment, as well as the regulatory acts imposed by it.*
Property document
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
MANDATORY The Opinion of the Zonal Commission of Historical Monuments (CZMI) – only for constructions located in the protection area of monuments or in protected built areas, which are NOT classified historical monuments or are in the process of classification, or if these are not constructions with architectural or historical value, established through urban planning documentation, according to art. 294 para. (3) of Law no. 169/2026.*
Property document
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
Technical execution project with simplified content, which will include documentation for: - architecture, - structural strength - installations, drawn up and assumed by specialists according to legal competencies, correlated with each other and with the conclusions and measures established by the technical expertise. In situations where the proposed intervention does not involve work on the structural strength and/or installations, for each of these specialties at least a technical report will be presented, drawn up and assumed by the competent specialist, justifying that such works are not necessary.*
Property document
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
Additional documentation, in the cases provided by law — art. 295 para. (7) of Law no. 169/2026, depending on the nature of the works and the specificities of the building. For example: Geotechnical study, for works that involve the construction of new foundations or if the works require interventions on existing foundations. Dendrological study, for works involving the planting of shelterbelts and afforestation on degraded lands where there was previously forest vegetation. Topographical study, for building extensions, in order to represent the existing situation and the location of the proposed works. Report on the minimum requirements for compliance of a nearly zero-energy building (nZEB), for attic conversions, in situations where the legal requirements regarding nZEB compliance are applicable. The consent of the co-owners and/or the owners’ association, for interventions on the common parts of the building and in other situations provided by law. Fire safety clearance, for works related to buildings and arrangements subject to clearance according to H.G. no. 571/2016 for the approval of the categories of buildings and arrangements subject to fire safety clearance and/or authorization, as subsequently amended and supplemented. Approval from the competent public health authority, for the change of use from residential to other functions.*
Property document
Descarcă
Scanned document
obligatoriu cu semnatură digitală disponibil și prin OOTS
PROOF OF PAYMENT calculated according to art. 313 of Law no. 169/2026, accompanied by the estimated bill of the proposed works, which forms the basis for its calculation.*
Issued documents

Denumire

Tip document

Descarcă


-
F_NOT_02-CONFIRMATION regarding the reception and registration of the notification*
obligatoriu cu semnatură digitală disponibil și prin OOTS
F_NOT_03-REQUEST for clarifications, additions, or documents regarding the notification*
obligatoriu cu semnatură digitală disponibil și prin OOTS
F_NOT_04-concerning the necessity of requesting and issuing a building permit*
obligatoriu cu semnatură digitală disponibil și prin OOTS
F_NOT_05-INFORMATION regarding the motivated rejection of the notification*
obligatoriu cu semnatură digitală disponibil și prin OOTS
F_NOT_06 - EXTRACT / PROOF regarding the fulfillment of the term and the stage of the notification procedure*
obligatoriu cu semnatură digitală disponibil și prin OOTS
Fees

Title

Payment method

Value

Currency


None
Deadlines
Resolution time:
20
Calendar days
Case filling duration:
3
Calendar days
Notification deadline:
2
Calendar days
Appeal routes

-see the Administrative Litigation Law

*
Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated: 
02 November 2026
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Institution responsible with document: 
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Cluj-Napoca City Hall*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
Str. Motilor nr. 3; email carte identitate: carte_identitate@primariaclujnapoca.ro
Telefon: 0264 596 030
Fax:
Email: registratura@primariaclujnapoca.ro
Table of contents

Competent entities

Directia Urbanism, Serviciul Urbanism
A.D.R.
This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
PNRR
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro