Home
Home
Single digital gateway for public services
favorite_border

Inspectorate for Emergency Situations Vasile Goldis Arad*

Available procedures

PROCEDURA
Companii
Cetateni
National

SI Authorization*

According to Article 301 paragraph (1) of Law 307/2006 updated regarding fire protection:

Commissioning of new constructions and arrangements and of existing ones where modification works and/or change of destination have been carried out is permitted only after obtaining the fire safety authorization for the categories mentioned in HGR 571 of 2016 updated with subsequent amendments and completions.



*
PROCEDURA
Companii
Cetateni
National

Procedure regarding the issuance of civil protection permits*

According to Article 30 paragraph (1) letter b) of Law 481/2004 updated regarding civil protection:
Starting construction works for new buildings and arrangements or extensions of existing buildings, provided with basements, with a built area greater than 150 sqm, if the developed area of the new constructions falls within the provisions of Annex no. 1 of Government Decision 862/2016.
*
PROCEDURA
Companii
Cetateni
National

Fire safety permit for standard projects of constructions with a high degree of repeatability*


Obtaining the fire safety permit for standard projects of constructions with a high degree of repeatability


*
PROCEDURA
Companii
Cetateni
National

Procedure regarding the issuance of the civil protection authorization*

According to Article 30 paragraph (1) letter b) of Law 481/2004 updated regarding civil protection:

The commencement of execution works for new constructions and arrangements or extensions of existing constructions, provided with a basement, with a built area greater than 150 sqm, if the developed area of the new constructions falls within the provisions of Annex no. 1 of HGR 862/2016.

*
PROCEDURA
Companii
Cetateni
National

The agreement for organizing fireworks shows with pyrotechnic articles*

The permit for organizing fireworks with pyrotechnic articles is the document issued, based on the law, by the county inspectorates for emergency situations and that of the municipality of Bucharest, after verifying the measures taken to prevent emergency situations, in accordance with the provisions of the technical regulations in force.
*
PROCEDURA
Companii
Cetateni
National

Procedure for issuing the point of view regarding the obligation to obtain the fire safety or civil protection authorization*

Checking the compliance of constructions and arrangements with the provisions of HGR no.571 of 2016 and HGR no.862 of 2016.
*
PROCEDURA
Companii
Cetateni
National

Procedure regarding the issuance of fire safety permits*

According to Article 30 paragraph (1) of Law 307/2006 updated regarding fire protection:
The commencement of construction and arrangement works for new buildings or modifications and/or change of use of existing ones is allowed only after obtaining the fire safety permit for the categories mentioned in Government Decision 571 of 2016 updated with subsequent amendments and additions.
*
PROCEDURA
Companii
Cetateni
National

PUZ Agreement-Fire Safety*

Obtaining PUZ approval.

*
PROCEDURA
Companii
Institutii
National

Procedure regarding the issuance and cancellation of specific permits for voluntary and private emergency services*

Procedure regarding the approval, establishment, dissolution, as well as the area of competence for the voluntary/private emergency service.
This procedure is addressed to the administrative-territorial units as well as to economic operators/institutions that have the obligation to establish the voluntary/private emergency service
*
PROCEDURA
Companii
Cetateni
National

PUG-civil protection agreement*

Procedure for issuing the civil protection agreement PUG phase.
*
PROCEDURA
Companii
Cetateni
Institutii
National

Procedure for receiving audience*

Documents submitted during the hearing are attached to the request for a hearing.
*
PROCEDURA
Companii
Cetateni
National

PUD-Fire Safety Agreement*

Obtaining PUD approval.
*
PROCEDURA
Companii
Cetateni
National

Fire Safety Agreement*

Agreement for issuing the fire safety permit.


*
PROCEDURA
Companii
Cetateni
National

Civil Protection PUD Agreement*

Agreement for issuing the civil protection agreement phase PUD.

*
PROCEDURA
Institutii
National

Localities preparation plan*

This procedure is addressed to UATs that are required to draw up the Preparedness Plan in the field of emergency situations.
*
PROCEDURA
Companii
National

Modification of hazardous waste transport routes*

Procedure regarding the modification of hazardous waste transport routes
*
PROCEDURA
Companii
Cetateni
National

Agreement for marketing pyrotechnic articles*

Obtaining permission to sell pyrotechnic articles is done after obtaining the authorizations from the Territorial Labor Inspectorate and the County Police Inspectorate.
*
PROCEDURA
Companii
Cetateni
National

Notice regarding the provision of access possibilities to public roads.*

Obtaining the approval regarding the assurance of access to public roads.
*
PROCEDURA
Companii
Cetateni
National

PUG-Fire Safety Agreement*

Obtaining PUG-Fire Safety approval.
*
PROCEDURA
Companii
Cetateni
National

Fire safety certificate*

Procedure for issuing the fire safety certificate.
*
PROCEDURA
Companii
Cetateni
Institutii
National

Petitions procedure*

Procedure for submitting petitions.
*
PROCEDURA
Companii
Institutii
National

Procedure of approval for evacuation plan*

The local public administration authorities, based on their own evacuation plans, drawn up by personnel with responsibilities in the field, approved by the vice president of the emergency situations committee and the head of the county/Bucharest municipality inspectorate for emergency situations and approved by the president of the committee.
Economic operators, based on their own evacuation plans, approved by the head of the county/Bucharest municipality inspectorate for emergency situations and approved by the president of the local emergency situations committee.
*
PROCEDURA
Companii
Cetateni
National

Location notice in the plot*

Obtaining the placement approval in the plot.
*
PROCEDURA
Companii
Cetateni
National

PUZ Agreement - Civil Protection*

Procedure for obtaining PUZ agreement - Civil Protection.
*
PROCEDURA
Companii
National

Plan for preparing economic operators and institutions*

This procedure is addressed to economic operators and institutions that are required to draw up the Emergency Preparedness Plan.
*
Inspectorate for Emergency Situations Vasile Goldis Arad*
Andrei Saguna nr. 66-72, Arad, RO
Telefon: 0257251212
Fax: 0257256712
Email: isujar@isuarad.ro

Assistance services

There are no Assistance services registered by this institution

Institutional structure

Compartimentul de Informare si Relații Publice
Serviciul Inspectia de Prevenire/ Compartiment de Control si Activitati Preventive
Centrul Operational
Serviciul Pregatire pentru Interventie si Rezilienta Comunitătilor
Serviciul Resurse Umane
Serviciul Inspectie de Prevenire/ Comparimentul Avizare - Autorizare
A.D.R.
This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
Your Europe
PNRR
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro